Landscaping a New Build Home in Hamilton
A new house comes with a builder's lawn on packed subsoil, a bare fence line and a grading plan you are responsible for keeping.
Materials at cost, no markup.
Call (905) 906-0671 or get a free written quoteQuick to quote, quick to start, we answer every call.Start dates are booked in the order quotes are accepted.
- Materials at cost no markup
- Free written quotes
- Fully insured
- 1-year craftsmanship warranty
- Hamilton owned and operated
Get your fast, free quote
We'll contact you quickly, usually within the hour. Planning for spring? We quote all winter.
We landscape the whole lot in the order that avoids digging twice: grading and drainage first, then the patio and the fence, the beds, and real sod last. Lumen Landscaping landscapes new build homes across Hamilton: call (905) 906-0671 or send the form for a free written quote.
Serving Hamilton, Ancaster and Burlington, from Mississauga to St. Catharines and inland to Guelph, Cambridge and Brantford.
New build landscaping
Your first yard on a new build, done once and done right
New home landscaping is the first real yard on a lot the builder left with packed subsoil, thin sod, a bare fence line and a grading plan you are responsible for keeping. We plan the whole lot with you and build it in the order that avoids digging twice: grading and drainage, then the patio and the fence, the beds, and the lawn last.
A lot of Hamilton’s new housing is close to home for us: Binbrook, Mount Hope, Waterdown and upper Stoney Creek, and below the escarpment in Grimsby and Beamsville. The houses are new, the lots are narrow, and most of the yards start the same way. The good news is that a new lot is a clean slate, and getting the order right the first time costs less than fixing it later.
Materials are billed at what they cost us, with the contractor discount passed straight to you. Call (905) 906-0671 or send the form for a free written quote.
Featured project
New sod front lawn and shrub bed See all projectsOur Work
First yards and new lawns from our crew
Builder grade sod and topsoil: what usually goes wrong
Most new build lawns fail for the same few reasons, and none of them is the grass.
The fix is real soil, not more fertilizer. Read new build lawn failing for the shovel test that tells you what you have, and sodding a new-build lot in Mount Hope and Binbrook for how the new lawn goes down.
-
“The team did an excellent job re-sodding our backyard.
They were professional, careful working around our pool, and the finished result looks fantastic.”
Sabah Google review
-
“I recently had Lumen remove the surface of our weed-infested lawn and replace it with fresh sod on the larger of two areas, and river rock on the smaller area.
It was a pleasure dealing with Jeff at Lumen.”
Chris L. Google review
-
“Excellent experience with Lumen Landscaping.
Efficient, knowledgeable, hardworking, and my lawn looks fantastic. Highly recommend! I had Lumen landscape a second project one year later. Same terrific experience.”
Kellie-Lyn C. Google review
A first patio, a walkway and a fence
The first patio. Off the back door, where the builder left a step down to the dirt. Interlock or slabs on a compacted base deep enough for the clay under many of Hamilton’s new subdivisions, sized for the table you have, sloped away from the house and kept clear of the swale. See interlock patios.
A walkway. A path down the side yard to the gate and the bins, so nobody tracks mud through the house, set beside the swale and never in it.
The fence. Many new lots come with a builder’s fence along part of the line, or none at all. A privacy fence to the height the by-law allows, with a gate wide enough for a mower, and a word with the new neighbours first if it sits on the shared line.
A deck. If the back door sits high above the yard, a deck or a landing comes first and the patio meets its stairs. See composite decks.
Why new homeowners choose Lumen
We do the grading, the drainage, the patio, the fence, the beds and the sod, so one crew plans the whole lot and builds it in the right order. You get a fast reply, a written quote with each part on its own line, and the same people from the first visit to the last roll of sod.
- Materials at cost, no markup You pay what the soil, sod, stone, lumber and plants cost us; the contractor discount is passed straight to you.
- 1-year craftsmanship warranty Our craftsmanship is warranted for one year.
- Fully insured Liability coverage on every job, so your home is protected while we work.
- Over 40 five-star Google reviews Local homeowners rate us 5.0 on Google.
Front beds and curb appeal
On a new street every house starts out looking the same, and the front yard is what makes yours look finished. A bed along the front of the house, a tree in the lawn with a ring bed around it, a slab or interlock walk to the door, and edging that keeps the grass out of the beds. Plants are chosen with you, several options for each spot, and billed at cost. If the City planted a tree on your boulevard, it is a City tree, and digging near it has rules of its own, so the bed is planned around it. See front yard landscaping and 10 front yard ideas for Hamilton homes.
Step by step
The order that avoids digging twice
Every part of a yard has its turn. Built in this order, nothing new gets torn up for the next job.
-
The grading checked first
We find the swales along the lot lines and the slope away from the house, and find out where your lot stands with the City before anything changes.
-
Drainage
Downspouts carried past the lawn, a wet corner given an outlet, and a French drain where a side yard stays soggy.
-
Patio and walkways
Bases dug and compacted while machines can still get into the yard, before the fence closes it in.
-
Fence and deck
Posts and footings in before the lawn, so nobody carries lumber across new sod.
-
Beds and planting
Front beds, privacy trees along the fence, shrubs and mulch.
-
Sod last
Real topsoil spread and graded to the plan, then Kentucky bluegrass sod laid tight and rolled, once nothing heavy has to cross the yard again.
Planning
What to check before you start
The grading certificate. Ask whether the final grading on your lot has been certified. The City says that if a lot’s final grading has not been certified, a site alteration permit is needed, with no exceptions, before landscaping such as regrading, retaining walls or new hard surfaces. We find out where your lot stands first and plan the job, and its timing, around it.
The swales you must keep. The shallow dips along the lot lines and across the back are part of the grading plan the City approved, and the homeowner is responsible for keeping them. Filling or blocking one can flood your yard or the neighbour’s in a heavy rain. A patio, a shed or a bed goes beside a swale, never in it.
The builder’s first year. Under Tarion, water ponding caused by surface grading is a builder item in the first year of the warranty, and the builder has to follow the approved grading plan. After the first year the homeowner maintains the grading, and changes you make to the landscaping are not covered, so if water ponds in year one, raise it with the builder before we change anything.
Locates. The buried gas, hydro and telecom lines are marked through Ontario Dig Authority (formerly Ontario One Call) before any digging. It is free and takes about five business days.
What affects the price.
- How much of the lot you want done now, and how much later
- The size of the lawn, and the topsoil it needs
- The patio, walkways and fence: size, material and style, billed at cost
- Drainage done at the same time
- Access, which on a new street is usually easy before the fences go up
The season. Spring to late fall. Sod and topsoil go down best in spring and early fall.
Related
Related pages
Services: grading, sod and lawns, yard drainage, French drains and landscape design. Problems: a new build lawn failing, water pooling in the yard and no privacy in the backyard.
How it works
Getting started is easy
-
Call or send the form
Tell us what you have in mind. We'll contact you quickly, usually within the hour.
-
Get your free quote
We look at your project and send you a clear, written quote quickly.
-
We build it
We start quickly and back our craftsmanship with a 1-year warranty.
Service Areas
Where we landscape new build homes
The newer subdivisions close to home: Binbrook and Glanbrook, Mount Hope, Waterdown and Stoney Creek, plus Hamilton, Ancaster, Dundas and Flamborough. Below the escarpment we work in Grimsby and Beamsville, and we also build in the newer streets of Burlington, Oakville, Mississauga and Cambridge, and as far as St. Catharines and Brantford. See all our service areas.
FAQs
New build landscaping questions
How soon after closing can we landscape?
As soon as you know where the lot grading stands. The City of Hamilton says that if a lot's final grading has not been certified, a site alteration permit is needed before landscaping such as regrading, retaining walls or new hard surfaces, and under Tarion a grading problem in the first year is the builder's to fix. Work that does not change the grade or add a hard surface is the simplest place to start, and we check where your lot stands before we plan the rest.
Can we landscape a new build in stages?
Yes, and many new homeowners do. A plan for the whole lot comes first, then the drainage and the patio one season and the beds and the lawn the next, each stage built so the next one does not tear it out. The fence and the deck often go in early, because they are the parts you want first.
Will the builder's grading change when you landscape?
It should not, and we do not change it. The slopes and swales were set to the plan the City approved, and keeping them is the homeowner's job after the builder's first year. Ground does settle beside a new foundation, and a low spot can be topped up to the original grade, within the 15 cm that routine landscaping allows, without changing where the water goes.
Should we replace the builder's sod or try to save it?
Dig a square a shovel deep and measure the dark topsoil before you hit pale, packed subsoil. If it is an inch or two, the lawn will keep struggling whatever you feed it, and the fix is real topsoil and new sod. If there is a good depth of soil and the lawn is only thin, it may come back with care. Read new build lawn failing.
What should go in first on a new build lot?
Anything that needs a machine or digs deep: the drainage, the patio base, the fence posts and the deck footings. The beds come next and the sod goes down last, once nothing heavy has to cross the yard again.
Do the swales along our lot lines have to stay?
Yes. They are part of the grading plan the City approved when the subdivision was built, and filling or blocking one can flood your yard or the neighbour's in a heavy rain. We plan patios, sheds and beds beside a swale, never in it, and we can reshape one that has silted up so it drains and mows better.
What does landscaping a new build cost?
It depends on how much of the lot you want done now, the size of the lawn and the topsoil it needs, the patio, walkways and fence you choose, and any drainage done at the same time. Materials are billed at what they cost us, with no markup, and the written quote is free.
Get Free Quote
Get a Free New Build Landscaping Quote
Tell us the street, how long you have been in the house and what you want first. We will check the lot’s grading, come out to walk it with you, and get back to you fast with a free written quote that puts each part in the right order.
Contact us today!
- Materials at cost no markup
- Free written quotes
- Fully insured
- 1-year craftsmanship warranty
- Hamilton owned and operated