Landscaping
Widening Your Driveway in Hamilton or Burlington
Lumen Landscaping
Yes, you can usually widen a driveway in Hamilton or Burlington, but the City has a say in two places: the part that crosses the boulevard to the street, and how much of your front yard can be paved. In Hamilton you need the City’s driveway access approval before you widen across the boulevard, and the City builds the approach ramp itself; in Burlington you need a driveway modification permit before you change an existing driveway at all.
We build interlock driveways and concrete driveways on your side of the property line, and we tell you before we quote whether your plan needs the City’s approval. The approval, the curb and the boulevard belong to the City. Here is what each city asks, checked on their own sites on November 25, 2026, and what the build itself involves.
Hamilton: what the City approves
Hamilton’s Residential Driveway Access Approval Guide says you need approval to build or widen a driveway access across the municipal boulevard. The main limits:
- Approach width: 2.7 to 3.6 m for a single and 5.4 to 6.1 m for a double, not counting the flares into the road, and the part on the boulevard runs straight out from the road.
- Parking on your own lot: a parking space is typically 2.7 to 3.0 m wide by 6.0 m long, and it has to fit entirely on your property.
- Your side lot line: the driveway cannot cross the line’s extension, so it cannot cut in front of the neighbour’s lot.
- Clearances: no driveway within 1.0 m of a fire hydrant, a utility box, a pole or a sign, and none inside the sightline triangle at a corner lot.
- Doors and stairs: 1.0 m of clear space stays in front of a door, stair or ramp, so a 6 m parking space in front of the door needs at least 7 m from the door to the property line.
- Green space: the City’s driveway page notes a 50% green space requirement under Zoning By-law 05-200: you cannot pave your whole front yard.
- Your zoning: the access approval does not approve the driveway on your lot. Its width, the parking space and the green space follow the zoning for your property, which the City’s interactive zoning map tells you.
Hamilton: trees, the ramp and timing
Trees. If the dripline of a City tree on the boulevard comes within 1.0 m of the new driveway, or of a private tree under the Dundas or Ancaster tree protection by-laws, you need written approval from City Forestry with your application. The City’s page adds that a permit may not be approved under the canopy of a City tree. Read tree roots lifting a walkway for what roots do to paving near them.
The application. It needs a scaled property diagram with every property line, the existing and the proposed driveway, the trees and utilities nearby, and every key dimension in metres to one decimal. A non-refundable application fee is paid before the review starts.
The ramp. Once the access permit is issued, Public Works sends the owner a cost estimate for building or widening the approach ramp, and approach ramps must be completed by the City: you cannot hire your own contractor for that part. The City’s page also warns against putting asphalt on the road to make or extend a ramp, which breaks the Streets By-law. We build the driveway on your side to meet the approach the City sets.
Timing. Ramps are built from about April to November, and the guide says applications sent after August 1 are generally installed the following season. If you want a wider driveway next summer, apply in the spring.
The boulevard parking program
In the former City of Hamilton only, a single-unit home that cannot fit a legal driveway on its own lot, or can fit only a single where a double is wanted, may be allowed a parking space that runs onto the City boulevard. The City’s boulevard parking requirements say it is not offered in Ancaster, Glanbrook, Dundas, Flamborough or Stoney Creek, and it is prohibited in some historic areas, including Markland, Gladstone and St. Clair. The space must be exactly 2.7 m wide for one car or 5.4 m for two, at least 6.0 m long, and at least half of the front yard on your own property has to stay lawn or garden. It is refused if it affects a City tree. It can start as gravel but must end up a hard surface such as asphalt, concrete or interlocking brick, and it is not guaranteed forever: the City can take the boulevard back. Our Hamilton and Stoney Creek pages cover the local side.
Burlington: the driveway modification permit
Burlington’s Driveways and Curbs page says a driveway modification permit is required before you widen an existing driveway or its walkway, make it circular or hammerhead, or add a second driveway, unless the work is part of a site plan approval. Any change to the curb or the sidewalk is arranged by the City. The driveway should be finished in a durable hard surface such as asphalt, paving stones or impressed concrete, generally run straight out to the street, respect the public and private tree by-laws, and, on escarpment land, have a Niagara Escarpment Commission development permit where one applies.
How wide it can be depends on your lot. Burlington’s Residential Zoning By-law 09-2026, in force in the residential zones since March 2, 2026, caps the combined width of driveways and walkways by lot frontage:
- Under 9 m of frontage: 4.5 m
- 9 m to under 12 m: 5.5 m, or 7 m where the house had a two-car garage on or before December 14, 2009
- 12 m to under 18 m: 7.5 m
- 18 m or more: 10 m
The rest of the front yard between the street and the front of the house stays landscaped open space. A driveway must be at least 2.75 m wide and 6 m long, and a circular driveway needs a frontage of 21 m or more.
Trees and grading matter here too. Inside Burlington’s urban boundary, the private tree by-law treats work inside the minimum protection zone of a tree 20 cm or more across as injuring it, which needs a permit, and the City’s site alteration screening checklist asks about any change of grade within 0.5 m of a property line, which is exactly where a widening toward the side lot line ends up.
How a wider driveway is built
Interlock. The new strip gets the same deep, compacted base as a full driveway, laid in thin layers and compacted after each one, to a depth that suits your soil. The old edge restraint comes off and the edge of the old driveway is opened up, so the new base and pavers tie into the old ones instead of butting against a loose edge. A new restraint locks the new outside edge, and the slope carries on so water runs to the street or the lawn.
Matching the old pavers. The same paver may no longer be made, and the old ones have faded. Three honest options: find the same product (a few leftover pavers in the garage help), clean the old driveway first so you can see its real colour, or frame the widening with a border band in a contrasting colour so the difference reads as design. Our interlock repair and patio restoration pages cover the cleaning.
Before and after: interlock driveway restoration
Concrete. A new slab is poured against the old one with a joint between them, on our usual driveway specification: a 4 inch compacted aggregate base, 10 gauge wire mesh and 32 MPa concrete at 4 inches or more. New concrete looks lighter than old concrete for a while, which is why some owners widen a concrete driveway with an interlock band instead.
Drainage. A wider driveway sheds more water, and widening toward a side lot line often lands on the swale that carries rain to the street. Hamilton asks homeowners to keep the lot grading the City approved and never to fill or block a swale. We plan where the water goes before we dig; see yard drainage and water draining toward the house.
What to have ready before a quote
- Your property survey, or the property lines from the City’s map
- Which zoning applies to your lot and its driveway limits
- Whether you have applied for the City’s approval or permit, and the width it allows
- Photos of the driveway, the boulevard and any tree, hydrant or pole near it
- The name of your pavers, or a few spares if you have them
- What you park: how many cars and how wide
How much does it cost to widen a driveway?
There are two bills. The City’s covers the application and, in Hamilton, the approach ramp it builds, quoted to you by the City. Ours covers the work on your lot, and what moves it is the length and width of the strip, how much soil and sod has to come out, the base depth your soil needs, interlock or concrete, matching pavers or adding a border, how much of the old edge has to be opened up, any drainage to fix, and access for the machine. We do not publish prices, but materials are billed at what they cost us, with no markup, and the written quote is free. For what a full new driveway involves, read interlock driveway cost in Hamilton.
Frequently asked questions
Can my contractor cut the curb or build the approach?
Not in Hamilton or Burlington. Hamilton’s approach ramps must be completed by the City, and in Burlington any change to the curb or the sidewalk is arranged by the City. We build the driveway up to the line to meet it.
Should I widen in interlock or concrete?
Usually whatever the driveway already is, unless you are replacing it. An interlock driveway can be widened in the same paver or framed with a border; a concrete one can take a new slab or an interlock band. Our guide to restoring or replacing an old paver driveway helps if the old part is tired.
Do I need a permit to widen my driveway?
In Hamilton, you need the City’s access approval to widen across the boulevard, and your zoning sets the width on your lot. In Burlington, you need a driveway modification permit before changing an existing driveway. Our permits guide for Hamilton and Burlington covers the related rules for trees, grading and fences.
Where these rules come from
Checked November 25, 2026:
- City of Hamilton: Residential Driveway Access Approval Guide, Residential Parking on Private Property, Residential Driveway Boulevard Parking Requirements and Lot Grading and Drainage
- City of Burlington: Driveways and Curbs, Residential Zoning By-law 09-2026, Part 6, Forest Protection and Tree Permits and the Site Alteration Screening Checklist